Butt weld flange
Weld neck flange
neck flange components. This comprehensive guide by industry engineers fuses trusted data,
product specifications, and real-world expertise to ensure optimum selection and deployment for your projects.
1. Neck Flange & Butt Weld Flange: Overview and Industry Trends (2024)
The neck flange—often referenced as butt weld flange or weld neck flange—remains a critical component in the global piping industry, facilitating secure, leak-proof connections in pipelines under high pressure or temperature. According to the latest (Global Market Insights, 2023), the industrial flanges market surpassed
USD 6 billion and is projected to register over 4.8% CAGR from 2024 to 2030, majorly driven by increasing adoption in oil & gas, power generation, and chemical sectors.
| Flange Type | Connection | Pressure Class (PN/ASME) | Main Materials | Dimension (inches/MM) | Certification/Standard |
|---|---|---|---|---|---|
| Weld Neck Flange | Welded (Butt Weld) | PN6~PN250 Class 150~2500 |
CS, SS, ASTM A105, A182 F304/316, Duplex | 1”–48” / DN25–DN1200 | ISO 7005, ANSI B16.5, EN 1092-1, JIS B2220 |
| Butt Weld Flange | Welded (Butt Weld) | PN10~PN160 Class 150~1500 |
Carbon Steel, Alloy, Stainless Steel | 2”–24” / DN50–DN600 | ANSI B16.47, API 6A, GOST, DIN |
Butt-weld neck flanges are renowned for their integral neck, which is welded directly to the pipe, providing superior mechanical strength and stress distribution at the base of the flange neck—making them an ideal solution for critical pipelines.
Market Adoption Across Sectors
- Oil & Gas: Enhanced leak-proof performance for sour service lines.
- Chemicals: High corrosion resistance, FDA/ISO compliance for process safety.
- Water Treatment: Longevity in aggressive environments, low maintenance.
- Power Generation: High-pressure, high-temperature sustainability.
2. Manufacturing Process of Neck Flange (With Flowchart)
Raw Material Selection
Verification by PMI, chemical & mechanical testing.
Forging/Heat Treatment
CNC Machining
Non-Destructive Testing
Final Inspection & Marking
Technical Analysis: Material, Standards, and Performance
- Material: Carbon steel for cost-effectiveness, stainless steel (304/316L) for corrosion resistance, duplex/super-duplex for critical services.
- Standards Complied: ISO 7005, ANSI B16.5/B16.47, EN 1092-1, API 6A/B, NACE MR0175, GOST 12820.
- Testing: PMI (Positive Material Identification), UT, RT, hydrostatic/air leak test.
- Service Life: 25–40+ years in optimal conditions (Field Data: API RP 574, 2022).
3. Key Specifications & Data Visualization
Essential Technical Indices for Butt-Weld Neck Flanges
Product Specification Table: Butt-Weld Neck Flanges (Selected)
| Model | Size (in/DN) | Pressure Rating | Facing | Material | Standard | Design Temp.(°C) |
|---|---|---|---|---|---|---|
| JYPN-150-6 | 6″/DN150 | Class150 / PN20 | RF | ASTM A105 | ANSI B16.5 | -29~345 |
| JYPN-300-10 | 10″/DN250 | Class300 / PN50 | RTJ | ASTM F316L | EN 1092-1 | -46~600 |
| JYPN-600-12 | 12″/DN300 | Class600 / PN100 | RF | Duplex 1.4462 | ASME B16.47 | -50~650 |
| JYPN-900-24 | 24″/DN600 | Class900 / PN150 | FM | ASTM A105N | DIN 2633 | -29~400 |
4. Industry Competitor Comparison
Selecting a reliable neck flange supplier is crucial for project security and cost-effectiveness.
Below is a summarized review of major global and Chinese manufacturers, focusing on certification, lead time, and customization.
| Company | Certifications | MOQ | Delivery | Customization | Year Established |
|---|---|---|---|---|---|
| Jianyang Pipeline | ISO 9001:2015, PED, EN10204 API, CE, SGS, Bureau Veritas |
1 piece | 10–45 days | All (design+material+coating) | 1998 |
| Ulma Forge (Spain) | ISO, ASME, PED | 5 pieces | 25–60 days | Partial | 1962 |
| Bonney Forge (USA) | ASME, ISO | 5 pieces | 35–80 days | Limited | 1876 |
| Kofco (Korea) | ISO, MSS SP-44, API | 10 pieces | 40+ days | No | 1981 |
5. Customization, Delivery, and Quality Promise
Tailored Solutions for Global Projects
- Customizable material grades, facings (RF, RTJ, FM), coatings (PTFE, Xylan), and branding.
- Full-size & non-standard dimensions as per client design—CAD drawings & 3D samples supported.
- Extensive documentation: EN10204 3.1/3.2, radiography, pressure and finish certificates.
Lead Time: 1–2 weeks for stock, 3–6 weeks for engineered/custom orders.
Warranty: 24–60 months based on specification and service.
Support: 8D complaint process, on-site support, spare parts, field measurement & remote guidance.
Compliance & Authoritativeness
- Verified by major EPCs: Sinopec, Shell, Aramco, BASF, PetroChina.
- 100% adherence to ISO 9001, CE, PED/97/23/EC, API, EN10204 standards.
- Tested for compliance with FDA and ASME for food/pharma projects.
6. Application Cases & Customer Feedback
- Project: Sulphur pipeline replacement under H2S conditions
- Product: NACE duplex weld neck flanges DN400/16″, Class 600
- Feedback: “Zero leakage after 30 months in service at 290°C. Inspection passed DNV/GL, surfaces had no corrosion. Outstanding quality.” — Project QA Lead
- Product: Butt-weld neck flanges, ASTM F316L, DN80–DN500
- Certification: LRS, EN10204 3.2 TPI
- Result: Service life exceeded 12 years in highly corrosive acid lines; quick-replacement feature reduced downtime by 36%.
- Flange: Epoxy-coated carbon steel neck flange, Class 150, DN250
- Advantage: Cost-effective, with 8% higher flow efficiency after CAD optimization; zero failure in three years.
Contact Us for Tailored Neck Flange Solutions
7. Professional FAQ for Butt-Weld Neck Flanges
8. Conclusion: Why Choose Certified Neck Flange Solutions?
Opting for a certified and expertly manufactured neck flange guarantees:
- Unmatched integrity in high-pressure, aggressive chemical, or cyclic temperature environments.
- Backed by global certifications (ISO, ANSI, CE) and real performance data;
- Endorsed by leading EPCs and subject to rigorous NDT & QA procedures.
- Flexible customization and fast global delivery.
For more technical papers and peer experience on neck flanges, refer to:
Weld Neck Flange Features & Best Practices
Industry Source 2:
Eng-Tips Forum – Neck and Butt Weld Flange Selection
Industry Source 3:
ScienceDirect – Investigation of High-Pressure Flange Joints
HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD . is located in Mengcun Hui Autonomous County, known as the “Capital of Elbows”, with a registered capital of 10.09 million yuan.pipe fittings and flanges manufacturers The company is equipped with advanced production facilities, strong technical capabilities and strict testing equipment, ranking among the top in the industry for its excellent quality and service.flanges and pipe fittings We have always been committed to technological innovation and improving product quality.flange manufacturer We have passed the ISO9001:2008 quality system certification and the special equipment certification for pressure pipelines. Our company specializes in the production of flanges, elbows, bends, reducers, blind plates, manholes, pipe caps, tees, crosses, socket fittings, power plant accessories, precision casting and threaded joints.pipe fitting manufacturer We also customize various special and difficult pipe fittings.pipe flange|super blog